text.skipToContent text.skipToNavigation
Come parte dei nostri nuovi aggiornamenti di sicurezza, ti chiediamo di reimpostare la password
ID: GB0119-2003

Breve panoramica

The 3-pallet shuttle system is specifically designed to integrate with the Kinematic System and 500 mm x 750 mm baseplates. This system enables users to manually transfer a baseplate from any of the three loading/unloading stations to the CMM via the Kinematic System. By allowing components to be loaded or unloaded at two stations while the CMM inspects components from the third station, the shuttle system effectively reduces downtime and maximises productivity.